We now have downstairs walls, joists between floors, a floor on the joists and a roof sitting in sections on the floor, a stairs and almost electricity. We also have sewerage and septic tanks in and a lot of clearing in the garden - including the trampoline hole.
Upstairs walls have just begun.
This is looking from the field into the playroom and craft room windows
same direction
the stairs
From the front door looking up the stairs and the door in the concrete wall is the downstairs bathroom.
Upstairs with the layer of board on top of the plastic on top of the ply!
Dad digging the hole for the septic tank
The view from our room
inside looking out of the kitchen towards the living room and through the fireplace to the sitting room.