Tuesday, 2 July 2013

July's Update

A lot has happened in the past 9 months or however long it is since November! We have first fix electrics and plumbing done - a lot of wires and pipes! Plastering started the day after the May bank holiday and is finished. We have painted the upstairs and are about to paint the downstairs. Fibreglassing in the bathrooms and laundry room is finished. Second fix plumbing has started and electrics is starting in the next couple of weeks. Flooring is about to go down in bathrooms and the living room. The kitchen is on its way and meant to arrive in 2 weeks. Doors are almost ordered. The stone masons are back and are doing a fantastic job outside on the garden wall. 

This picture is before the plastering and after the plasterboard, we eventually see what the stove looks like when it is inset! This is the living room side.


This is in the sitting room side and the walls had literally just been plastered.



Looking up the stairs from the hall, all plastered. 

This is K's room, plastered and painted, this is the sleeping loft. 
  

The laundry room with the water tank and all the paint buckets. It is finished painting too. 
  

This is the two younger girls' room, both are purple, very purple! 


Very happy with the bathroom, the colour is called bamboo leaf and it really is a bamboo colour, it matches the fibreglass perfectly, phew!

This is our shower, the walls outside look pink but are more a purple/plum colour. We have a shower head!

This is looking into our walk in wardrobe door
 Here is the sprayer himself!

No comments:

Post a Comment